ACTIVIDAD DESACTUALIZADA 2010 |
Unidad |
Basico |
K Ferr. |
K Manu. |
K Petr. |
Porcentaje Mano Obra |
VÍAS |
|
|
|
|
|
|
LOCALIZACION Y REPLANTEO VIA |
KM |
2004699,89 |
293,6 |
|
|
41,45 |
MOVILIZACION DE EQUIPO KM |
KM |
9765,47 |
3,13 |
|
|
0 |
DESMONTE Y LIMPIEZA EN ZONAS NO BOSCOSAS |
HA |
1248938,13 |
162,75 |
|
|
0 |
DESMONTE Y LIMPIEZA EN BOSQUES |
HA |
1795456,22 |
220,24 |
|
|
4,93 |
EXCAVACION DE CAPA VEGETAL CON BULLDOZER |
M3 |
2497,88 |
,32 |
|
|
0 |
EXCAVACION A MAQUINA EN TIERRA CON BULLDOZER |
M3 |
2497,88 |
,32 |
|
|
0 |
EXCAVACION DE CORTES CANALES Y PRESTAMOS (INCLUYE ACARREO 3 KM) |
M3 |
9268,59 |
2,65 |
|
|
0 |
EXCAVACION DE CORTES CANALES Y PRESTAMOS (INCLUYE ACARREO 1 KM) |
M3 |
6745,72 |
1,85 |
|
|
0 |
EXCAVACION EN CONGLOMERADO (75% CON BULLDOZER, 25% DINAMITA) |
M3 |
6774,72 |
,59 |
|
|
0 |
EXCAVACION MECANICA EN ROCA |
M3 |
27560,08 |
1,11 |
|
|
36,94 |
EXTRACCION DE DERRUMBES EN MATERIAL COMUN |
M3 |
1998,3 |
,26 |
|
|
0 |
EXTRACCION DE DERRUMBES EN ROCA |
M3 |
3996,6 |
,52 |
|
|
0 |
CONFORMACION DE LA BANCA EXISTENTE |
KM |
2316700,83 |
459,75 |
|
|
0 |
TERRAPLEN Y RELLENOS CON MATERIAL DE PRESTAMO |
M3 |
6871,26 |
1,23 |
|
|
0 |
TERRAPLENES CON PRESTAMO LATERAL (INCLUYE COLOCACION Y CONFORMACION DE TERRAPLENES CON DISTANCIA DE ACARREO LIBRE: 100 M. Y PRESTAMOS) CON BULLDOZER |
M3 |
3330,5 |
,44 |
|
|
0 |
PEDRAPLENES, INCLUYE EXCAVACION, COLOCACION Y COMPACTACION |
M3 |
54241,74 |
2,82 |
|
840,8 |
4,98 |
CONFORMACION DE TERRAPLEN, INCLUYE EXCAVACION DE CORTES, CANALES Y PRESTAMOS, ACARREO LIBRE 1 KM |
M3 |
15648,12 |
3,2 |
|
|
1,86 |
CONFORMACION DE TERRAPLEN ESTABILIZADO CON CEMENTO, INCLUYE EXCAVACION DE CORTES, CANALES Y PRESTAMOS, ACARREO LIBRE 1 KM |
M3 |
39248,12 |
38,2 |
|
|
,74 |
CONFORMACION DE TERRAPLEN CON MATERIAL DEL SITIO |
M3 |
8398,2 |
1,52 |
|
|
0 |
SUB-BASE GRANULAR TAMAÑO MAXIMO 3 PULG. CLASIFICADO INCLUYE DERECHOS DE EXPLOTACION, PRODUCCION, ACARREO, EXTENDIDA Y COMPACTADA |
M3 |
46601,62 |
3,68 |
|
875,84 |
1,27 |
SUB-BASE GRANULAR TAMAÑO MAXIMO 3 PULG. TRITURADO INCLUYE DERECHOS DE EXPLOTACION, PRODUCCION, ACARREO, EXTENDIDA Y COMPACTADA |
M3 |
62851,62 |
3,68 |
|
875,84 |
,94 |
BASE GRANULAR TAMAÑO MAXIMO 1 1/2 PULG. CLASIFICADO INCLUYE DERECHOS DE EXPLOTACION, PRODUCCION, ACARREO, EXTENDIDA Y COMPACTADA |
M3 |
56665,01 |
3,94 |
|
910,87 |
1,04 |
BASE GRANULAR TAMAÑO MAXIMO 1 1/2 PULG. TRITURADO INCLUYE DERECHOS DE EXPLOTACION, PRODUCCION, ACARREO, EXTENDIDA Y COMPACTADA |
M3 |
78947,01 |
3,94 |
|
910,87 |
,75 |
AFIRMADO EN GRAVA |
M3 |
44569,04 |
2,62 |
|
980,94 |
0 |
AFIRMADO EN PIEDRA PARTIDA |
M3 |
98415,06 |
2,73 |
|
980,94 |
0 |
IMPRIMACION |
M2 |
3061,07 |
1,75 |
|
|
2,41 |
CARPETA ASFALTICA MDC1 (INCLUYE IMPRIMACION) |
M3 |
568516,66 |
76,22 |
|
1041,54 |
2,16 |
CARPETA ASFALTICA MDC1 |
M3 |
503293,69 |
41,3 |
|
1041,54 |
2,45 |
CARPETA ASFALTICA MDC2 |
M3 |
480128,35 |
3,77 |
|
1041,54 |
2,56 |
ALCANTARILLA 5 TUBOS Ø 36 PULG. 5 M. |
UN |
6840027,67 |
2843,22 |
|
31568,02 |
37,57 |
ALCANTARILLA 6 TUBOS Ø 36 PULG. 6M. |
UN |
7492746,86 |
2988,35 |
|
35139,02 |
37,99 |
ALCANTARILLA 6 TUBOS Ø 24 PULG. 6M. |
UN |
5368534,57 |
2005,28 |
|
28566,43 |
39,88 |
ALCANTARILLA 7 TUBOS Ø 36 PULG. 7 M. |
UN |
8119836,73 |
3133,52 |
|
38765,85 |
38,15 |
ALCANTARILLA 8 TUBOS Ø 36 PULG. 8 M. |
UN |
8748065,92 |
3278,69 |
|
42437,33 |
38,3 |
ALCANTARILLA 9 TUBOS Ø 36 PULG. 9 M. |
UN |
9383681,8 |
3426,33 |
|
46163,35 |
38,43 |
ALCANTARILLA 10 TUBOS Ø 36 PULG. 10 M. |
UN |
10018130,36 |
3571,54 |
|
49924,14 |
38,55 |
ALCANTARILLA DOBLE 12 TUBOS 6 M. |
UN |
14304245,42 |
6597,45 |
|
58035,99 |
30,42 |
BOX CULVERT 2,5 * 2,5 * 6 M |
UN |
28911484,88 |
17963,84 |
|
40608,99 |
43,37 |
BOX CULVERT 3,0 * 4,0 * 6 M |
UN |
40172322,05 |
25919,07 |
|
60582,61 |
43,08 |
SOLADO CONCRETO 2.500 PSI |
M3 |
361785,31 |
257,99 |
|
1078,92 |
30,99 |
CONCRETO 3.000 PSI ALCANTARILLA |
M3 |
545738,53 |
369,84 |
|
1058,54 |
41,81 |
CICLOPEOS ALCANTARILLA |
M3 |
386392,39 |
242,61 |
|
985,99 |
51,35 |
TUBO CONCRETO Ø 24 PULG |
UN |
150357,81 |
266,3 |
|
246,66 |
29,45 |
TUBO CONCRETO Ø 36 PULG. |
ML |
187803,87 |
592,69 |
|
339,15 |
23,13 |
GAVIONES |
M3 |
108448,94 |
44,61 |
|
875,84 |
33,98 |
DREN FRANCES (0,5 * 0,5) |
ML |
29518,68 |
5,74 |
|
203,19 |
50,95 |
GEOTEXTIL NO TEJIDO |
M2 |
3773,36 |
2,63 |
|
|
19,25 |
LINEAS DE DEMARCACION |
ML |
3406,04 |
,13 |
|
|
75,87 |
RETIRO MATERIAL SOBRANTE DE EXCAVACION ENTRE 1 Y 5 KM. |
M3 |
7708,23 |
1,88 |
|
|
16,06 |
ACARREO DE MATERIAL AFIRMADO Y/O TERRAPLEN CARRETERA PAVIMENTADA |
M3-KM |
1119,77 |
,38 |
|
|
0 |
TRANSPORTE MATERIALESCON CARGUE Y DESCARGUE (PARA 40 KM) |
M3-KM |
1695,15 |
,38 |
|
|
30,86 |
ACARREO DE MATERIAL AFIRMADO Y/O TERRAPLEN CARRETERA SIN PAVIMENTAR |
M3-KM |
1493,03 |
,51 |
|
|
0 |
SOBREACARREO DE MATERIAL EXCAVADO (DE 100 A 150 M.) |
M3-KM |
532,88 |
,07 |
|
|
0 |
MATERIAL GRANULAR |
M3 |
6799,91 |
,97 |
|
|
0 |
SUMINISTRO Y APLICACION DE PINTURA ACRILICA PARA TRAFICO BLANCA O AMARILLA ANCHO 12 CM. |
ML |
1235,15 |
,16 |
|
|
4,12 |
SUMINISTRO E INSTALACION DE TACHAS REFLECTIVAS |
UN |
12057,9 |
,86 |
|
|
21,54 |
SUMINISTRO E INSTALACION DE ESTOPEROLES DE 10 CM. DE DIAMETRO Y 2,5 CM. DE ALTURA |
UN |
8245,9 |
,79 |
|
|
31,49 |
FORMALETA PARA CONCRETO DE 3.000 PSI PARA ALCANTARILLA UN USO PARA 1 M3 |
GL |
149667,73 |
197,88 |
|
|
27,21 |
FORMALETA PARA CONCRETO CICLOPEO PARA ALCANTARILLA UN USO PARA 1 M3 |
GL |
116395,15 |
251,77 |
|
|
34,98 |
DEMOLICION ALCANTARILLA TIPO |
UN |
596166,94 |
157,52 |
|
|
7,42 |
|